As one of the first domestic enterprises to obtain the production qualification of new energy vehicles, RAJA built its own power station to provide the overall sister plan from car purchase to electricity change. The battery size, quantity, volume, volume and platform interface of the electric changing cabinet are standardized. Without changing the motor and electric control of the existing models, a single electric changing only takes 5 minutes to realize the rapid conversion from charging to electric changing. Moreover, the battery fault can be solved through the rapid electric changing method to ensure the efficient operation of the city distribution logistics.
Compared with the traditional charging mode, the electric change mode of Yajun New energy can effectively solve the pain points of light truck charging parking scarcity, large battery capacity, long charging time and so on. It is an effective solution for electric energy supply of commercial trucks.

-
Efficiency & Profitable
Procurement cost reduction is as high as 50%, change the power battery in 5 minutes
-
Safe & Reliable
There is no need to buy batteries. By leasing batteries, owners can always use new batteries to ensure a safe range.
-
Convenient & Flexible
Instead of charge your truck for a long time, you can go on after changing the battery in 5 min. It is also flexible to move, the required area is small.
-
High compatibility & low cost
Adapted to regional distributed photovoltaic and micro-grid power generation and energy storage systems, the generated electricity can be used spontaneously and locally, greatly reducing energy costs.
- Household renewable energy storage
- Profit from peak and valley electricity prices
- Isolated island
- Emergency power backup
- Single phase
- Three phase

